A high-performance physical server and audio-processing workstation cabinet engineered specifically to house DubForge local edge nodes, local GPU acceleration rigs, and high-fidelity audio monitoring hardware. Crafted from solid White Ash hardwood to deliver superior stiffness, structural vibration damping, and long-term durability in continuous SaaS processing environments.
advanced wood other
Dimensions: {"unit":"in","depth":12,"width":24,"height":36,"autoEstimate":true}
Materials
- 4/4 White Ash Hardwood
- 3/8" White Ash / Birch Cabinet Backing
- High-Efficiency 120mm Dust Filters & Grilles
Tools Required
- Table Saw with 80T Fine Crosscut Blade
- Router Table with 1/4" and 3/8" Straight/Spiral Bits
- Domino Joiner or Mortising Chisel Set
- Random Orbital Sander (120, 180, 220 grit disks)
- Parallel Bar Clamps (4x 24", 4x 40")
- Digital Calipers & Precision Machinist Square